Hawker Beechcraft balanced its aircraft line like a factory and saved $30M

Aircraft moved on schedule even when work lagged; balancing the 800XP line like a factory cut out-of-station work and saved $30M+.

Hawker Beechcraft

The solution

In 2002 Hawker Beechcraft's Hawker 800XP assembly line was paced by the clock: an aircraft moved to the next workstation on schedule even if work at the previous station was unfinished. Work-in-progress ran high and most work was completed out of station.

Management wanted a quantitative answer to how many workstations the line needed and how to assign tasks. The team proposed an approach based on assembly-line balancing principles, customized to a complex product in a real aircraft setting.

Hawker Beechcraft implemented the recommended solution on the 800XP line in 2003 and later used the approach to balance two other lines, saving over $30 million.

Why it worked

  • Clock pacing without balance just pushes work in progress downstream
  • Task assignment and station count were solved together
  • Customizing textbook balancing to aircraft made it usable
  • The same model scaled to two more product lines
What it achievedBalance the line around real, complex tasksclever

What can be applied

Pacing without balance just moves incomplete work downstream: quantify tasks, pick station count and assignments together — factory discipline lifts an aircraft line too.

Aftermath

The approach spread to two additional Hawker Beechcraft lines, and the project was published as an Interfaces case documenting the $30 million-plus savings.