EN
返回档案库

案例库 · 工程与运营 · 运营决策 · 2013-2018

这条还没译成中文,下面是英文原文。

Danone's China water network saved 4.6% of costs with one DSS

One decision-support system plans production and distribution across 26 plants, 27 DCs and 2,000+ warehouses, cutting costs 4.6%.

Danone Waters China

那一手

Danone Waters China produced about 500 million cases a year, roughly 45% of Danone China's income, from 26 factories through 27 distribution centres to more than 2,000 local warehouses. Growth of about 5% a year made spreadsheet-based production and distribution planning slow, inconsistent, and expensive.

The company developed a decision-support system whose mathematical models plan production and distribution together, incorporating all-unit quantity discounts, output-dependent production costs, and seasonal demand. Managers can adjust assumptions and re-run plans quickly.

In 2013, total cost came in at ¥665.626 million versus a budget of ¥698.305 million, a 4.6% reduction including 3.8% lower production cost and 6.2% lower transportation cost. The savings rate stayed above 3.5% in subsequent years, and planning decisions became far faster.

为什么管用

  • One integrated model captured production and distribution trade-offs.
  • It institutionalised a consistent planning process across the network.
  • Fast scenario runs let managers react to demand changes.
  • The savings were audited against an explicit budget baseline.
值了多少Plan the whole network as one model聪明

可以搬走什么

When a network is too big for one person to see, a single integrated model beats siloed spreadsheet plans. The model's value is both the cost cut and the speed and consistency of decisions.

后来呢

Danone kept the DSS in use and extended the approach to later years, with savings above 3.5% annually; the case was published in Interfaces in 2018.

资料来源

发现哪里写错了?告诉我们。

同一路聪明