Britain allocates renewable energy support through annual reverse auctions: developers bid the lowest price at which they will build, win a 15-year two-sided Contract for Difference, and compete until the budget is spent. Between 2015 and 2023 the government cut the maximum allowed offshore wind bid every single round — from £140/MWh in the first auction to £44/MWh in Allocation Round 5 — proudly chasing the cost curve downward.

Then costs went the other way. Post-pandemic inflation and interest rates raised offshore wind supply-chain costs by 20–40%, while the 2023 cap stayed at £44 in 2012 prices. In September 2023, Allocation Round 5 closed with not one offshore wind bid — solar, onshore wind and tidal projects still bid, but the sector's flagship technology sat out. SSE's chief executive said it flatly: the prices were just set too low.

The government's answer, announced that November, was to re-price rather than retreat: the offshore cap up 66% to £73/MWh, floating wind up 52% to £176, and (under the next government) the budget raised by £500 million to a record ~£1.56 billion including £1.1 billion for offshore wind. In September 2024, Allocation Round 6 awarded a record 131 projects totalling almost 10 GW — among them nine offshore wind farms, led by Ørsted's 2.4 GW Hornsea 4.

An auction only works when the cap clears

The zero-bid outcome was the auction working, not failing: bidders refused contracts below cost, so the state avoided locking in unbuildable projects.

A capped price was the real constraint — once lifted above cost, the competitive pressure inside the auction still pushed awards below the new cap.

The two-sided CfD kept consumers protected: when market prices run above the strike price, generators pay the difference back.

Re-running with a credible cap preserved the allocation mechanism that had cut offshore wind prices for a decade, instead of replacing it with discretionary grants.

A reserve price is a bet that costs keep falling; recalibrate when input costs reverse. Zero bids are a legible, cheap failure — re-price and rerun, don't abandon competitive allocation.

The repaired auction was vindicated by the next round: Allocation Round 7, announced in January 2026 with a £1.79 billion budget, drew a record 19 eligible projects totalling 24 GW and awarded 8.4 GW of offshore wind — the largest European offshore auction to date — with fixed-bottom strike prices of £91.20/MWh in England and Wales and £89.49/MWh in Scotland, about 40% below the cost of new gas power.

FOLLOW THE EVIDENCE

The sources

  1. No bids for offshore wind in government auction bbc.co.uk
  2. Boost for offshore wind as government raises maximum prices in renewable energy auction gov.uk
  3. Record UK renewables auction gives boost to offshore wind reuters.com
  4. Fact check: Major hurdle for offshore wind auction was changed by Conservatives pa.media
  5. UK awards 8.4 GW in Europe's largest offshore wind auction ever windeurope.org