The solution
Nepal's Kathmandu-Kolkata trade route had the usual visible bottleneck at the border, but agricultural exporters also lost time to regulatory testing. For perishable goods, a few days of paperwork could erase commercial value.
The World Bank-supported Nepal-India Regional Trade and Transport Project combined infrastructure, capacity building for domestic laboratories, and simplified trade transactions. It ran from 2013 to 2021.
The reported results were sharp: Raxaul-Birgunj border crossing time fell 62%, from 2.3 days to 0.87 days, while time to meet import, export, and transit regulatory requirements dropped from 4.8 days to 2.5 days.
The clever piece was the SPS building in Kathmandu. By creating testing capacity closer to exporters, the project attacked shipment delays, high costs, and losses caused by missing internationally accredited laboratories.
What it achieved
Remove the paperwork delay that spoils the cargo
Why it worked
It measured elapsed corridor time rather than treating border crossing as the only problem.
Laboratory capacity converted a regulatory delay into a local service.
The saved 2.3 regulatory days mattered because the World Bank equated it to about half the shelf life of fresh pulses.
The project tied infrastructure and process simplification together, so faster roads were not trapped behind old paperwork.
What can be applied
In logistics, the binding bottleneck may be a certificate rather than a road. Map the whole elapsed time, then fix the step that consumes the product's useful life.
Aftermath
The World Bank later cited the project as part of its food-supply-chain resilience results, emphasizing lower logistics costs on the Kathmandu-Kolkata corridor and reduced post-harvest losses for agricultural trade.
FOLLOW THE EVIDENCE
The sources
- Increasing Connectivity for Enhanced Food Supply Chain Resilience worldbank.org
- Nepal-India Regional Trade and Transport Project projects.worldbank.org