EN
返回档案库

案例库 · 工程与运营 · 运营决策 · 2006–2007

这条还没译成中文,下面是英文原文。

Standard Register cuts landed cost by re-routing print orders across plants

Standard Register used regression, optimization and simulation to route print orders, targeting $10M+ a year.

Standard Register Company

那一手

Standard Register led high-volume production of business forms and print stationery for major US firms, competing on price in a shrinking traditional print segment.

To minimize total landed cost, the team applied three operations research techniques: regressions to estimate each printing press's cost and time efficiency on different job types, optimization to pick the optimal order-routing strategy, and simulation to assess optimal and heuristic allocation under uncertainty of customer orders and equipment performance.

The combination let the company route each order across its production-distribution network to the press that was genuinely cheapest for that job.

为什么管用

  • Regression converted a press's subtle strengths into numbers the planner could compare.
  • Optimization chose an order-routing strategy across the whole network, not per job.
  • Simulation tested the plan under uncertainty before committing capacity.
  • The result shifted policy rather than being a one-off cost study.
值了多少Route each order across the network, not by habit聪明

可以搬走什么

In a plant network, the cheapest factory for a job is not fixed; the win is re-routing every order based on what each press is actually good at.

后来呢

The study found an estimated potential annual savings of over $10 million across Standard Register's major product segments in high-volume rotary production, and it produced a strategic shift in the company's capacity-allocation policies. The executive leadership launched system-wide production-distribution improvement initiatives and accelerated building real-time supply-chain decision-support capabilities to support it.

资料来源

发现哪里写错了?告诉我们。

同一路聪明